PROJECT HIGHLIGHTSProject highlights and photos.

Return to LT PILING SDN BHD Corporate Mainpage.
9 43
Steel sheet piling – KTMB Double Tracking


P4080800.jpg

7 files, last one added on May 16, 2012
Album viewed 202 times

Temporary Steel Crossing Bridge


002.jpg

7 files, last one added on May 17, 2012
Album viewed 135 times

Steel Sheet Piling - Off-Shore Protection


2011-11-02_12_22_57.jpg

11 files, last one added on May 16, 2012
Album viewed 311 times

Concrete sheet piling – River Mitigation


P4070781.JPG

9 files, last one added on May 18, 2012
Album viewed 145 times

Sheet Piling Work with Strutting System


Page0002.jpg

2 files, last one added on May 16, 2012
Album viewed 176 times

Sheet Piling Work Crossing Lake at Putrajaya


Page0012.jpg

2 files, last one added on May 16, 2012
Album viewed 110 times

Ampang-KL Elevated Highway


Page0013.jpg

1 files, last one added on May 16, 2012
Album viewed 62 times

Strutting Works


Page0006.jpg

3 files, last one added on May 16, 2012
Album viewed 368 times

Light Rail Transit (LRT Ampang –Kelana Jaya)


001.jpg

1 files, last one added on May 17, 2012
Album viewed 122 times

9 albums on 1 page(s)

PROJECT IN PROGRESSOur latest projects and photos.

Return to LT PILING SDN BHD Corporate Mainpage.
1 0
Project Photos



0 files
Album viewed 0 times

 

 

1 albums on 1 page(s)

Redevelopment of Tanjung Bin 4 {RM2,624,765.00]Redevelopment of Tanjung Bin 4 - 1 x 1000MW Coal Fired Power Plant Project at Pontian, Johor, Malaysia
Steel sheet piling work
1 0
Tanjung Bin 4 - Coal Fired Power Plant [RM1,478,070.00]Redevelopment of Tanjung Bin 4 - 1 x 1000MW Coal Fired Power Plant Project at Pontian, Johor, Malaysia
Pre-stressed Concrete sheet piling work at Coal Run Off Pond (C09); Cooling Water Open Channel (E50B)
1 0
Jalan Genting Kelang MRR II [RM257,121.58]Cadangan Mempertingkatkan Jalan Genting Kelang dari Persimpangan Jalan 1/27A hingga ke Persimpangan Jalan Lingkaran Tengah II, Kuala Lumpur (2013/A033)
Installation Permanent and Temporary sheet piling works
1 0
LRT - Kelana Jaya Line Extension Project [RM918,950.00]The Construction and Completion of Facilities Works
(Package A) for the Kelana Jaya (KLJ) Line Extension Project
Temporary sheet pile cofferdam and piling platform
1 0
MRT V3 [RM108,000.00]Projek Mass Rapid Transit Lembah Kelang Jajaran Sungai Buloh - Kajang
Package V3: Construction and Completion of Viaduct Guideway and Other Associated Works from Dataran Sunway Station to Section 17
Temporary Waler and Strut for pile cap construction to Pier C11 to C19
1 0
MRT V3 [RM700,000.00]Projek Mass Rapid Transit Lembah Kelang Jajaran Sungai Buloh - Kajang
Package V3: Construction and Completion of Viaduct Guideway and Other Associated Works from Dataran Sunway Station to Section 17
Rental of One unit Komatsu Excavator with Vibro Hammer for Temporary sheet piling works
1 0
MRT V7 [RM1,659,619.42]Projek Mass Rapid Transit Lembah Kelang Jajaran Sungai Buloh - Kajang
Package V7: Construction and Completion of Viaduct Guideway and Other Associated Works from Bandar Tun Hussein Onn to Taman Mesra
Supply Machinery, Equipment and Skilled Labour for Temporary Sheet Piling Works
1 0
MRT V8 [RM5,825,551.18]Projek Mass Rapid Transit Lembah Kelang Jajaran Sungai Buloh - Kajang
Package V8: Construction and Completion of Viaduct Guideway and Other Associated Works from Taman Mesra to Kajang Station
Temporary sheet piling works for excavation works for pilecap
1 0
43 files in 18 albums and 10 categories with 0 comments viewed 5,721 times